Cast Iron Manhole Cover and Drain Grating

Products

Cast Iron Manhole Cover and Drain Grating

Cast Iron Manhole Cover and Drain Grating

Supply High Quality Square and Round Ductile Cast Iron Manhole Cover and Drain Grating Product Application :Manhole cove

Send your inquiry

DESCRIPTION

Basic Info
Model NO. MCC-D-0001
Weight 27kg-150kg
Surface Treatment Black Bitumen / Epoxy Painting / 3D Printing
Service ODM & OEM
Color Colorful (Customized)
Application Road Traffic Safety, Road Facilities
Lifespan Over 10 Years
Pattern Customized, Provide Related Drawing
Transport Package Plywood Pallet
Specification 600mm 650mm 700mm Dia Customized
Trademark Feilong
Origin China
HS Code 7325109000
Product Description
Supply High Quality Square and Round Ductile Cast Iron Manhole Cover and Drain Grating

Product Application :Manhole covers are manufactured for road construction, natural gas, water supply and drainage,
telecommunications. Manhole covers and gratings should be smooth, no blisters, holes, distortion or any other defects.

Size: 500mm,600mm,700mm,800mm, 850mm, etc.

Material
Ductile Iron GGG500, stainless steel, or resin composite.

Designs
EN124 A15, B125, C250, D400, E600 and F900. According to clients' requests.

Size

Loading Capacity

Total Weight(kg)

Cover Weight(kg)

Frame Weight(kg)

800×900×80

D400

63

44.5

18.5

748×970×100(A/B)

D400

97

62

35

740×900×100

D400

84

47.5

36.5

700×900×100

D400

65

42

23

700×850×80

D400

55

35.5

19.5

700×800×75

D400

50

36.5

13.5

600×730×90

D400

45

30.5

14.5

600×700×60

D400

40

30.5

9.5

500×630×90

D400

35

22

13

700x900x100

E600

90

68

23

500×630×90

E600

51

38

13


Cast Iron Manhole Cover and Drain Grating

Cast Iron Manhole Cover and Drain Grating

Cast Iron Manhole Cover and Drain Grating

Cast Iron Manhole Cover and Drain Grating

Cast Iron Manhole Cover and Drain Grating

 

About Us

Anhui Feilong New Material is a company which is integrating R&D, manufacturing and sale in one for municipal supporting products, especially for all kinds of manhole covers, trench covers, draining system, etc. By focusing on R&D and constantly investing in improving manufacturing capabilities and processes, Feilong is committed to pushing the industry forward with the development of quality standards and innovations to meet the ever-changing demands of customers. Located in Lintou town, Hanshan county, which is known as the "Hometown of Casting in East China", Feilong Group owns a 150,000 square meter factory, including 9 standardized digital workshops, 200 units(sets) hydraulic equipments, 7 digital automated production lines and over 500 employees. Always uphold the spirit of craftsmanship, we've passed ISO9001, ISO14001 and OHSAS1800, etc. Untill now, Feilong has more than 800 product specifications and has won dozens of national patents. There are totally 4 series product lines: high strenghth composite matertial products, ductile cast iron material products, new SMC material products and stainless steel products.Standing firmly by quality, winning firmly by proficient, in the past years of development, Feilong continuous growth and brand positioning are all relied onto the long term partnership with variety channel customers.FAQ

1.Do you support customization? Can I have my logo on the product?
Yes, we provide both ODM&OEM service, if you need customized service, you should only provide the product drawings and show us the detailed request.
2.How about the payment?
Generally, 30% deposite T/T before production ,70% balance before shippment.
3.How can you guarantee the quality of mass production?
Before mass production, we can send sample to comfirm first. During the production, we have QC to make sure every process is under controled. And the final inspection before shipment. The testing video would be sent before shipment.
4.How long is your delivery time?
Owning a 150,000 square meter plant and over 500 employees, generally a regular 20ft order would be delivered within 15 days.
5.How long it will be taken to develop a new molding according to the drawings?
Generally speaking, it would within 20-30 days.